ワイツー設計の宇井です。
2013年6月30日
工事もいよいよ終盤!
壁の仕上げ、照明機器の取り付けなどが終わり、
内部足場が明日以降に撤去されます。
このアングルも見納めです。
聖壇窓脇に、吉野檜が取り付きました。
(写真-2)(Photo-2)
礼拝堂の照明は、直接照明と間接照明の合わせ技?
(写真-3)(Photo-3)
Yasunobu Ui from Y two Architectural design company.
June 30th, 2013
The construction approached a final process.
The completing of a wall, the installation of the lighting apparatus ended.
An inside-scaffold is removed tomorrow.
The wall at the chapel is a plaster wall and fits the texture of the tree well.
(Photo-1)
The pillar of Yoshino Japanese cypress was installed.
It good!
(Photo-2)
(Photo-2)
As for the illumination of the chapel, it adjusted a direct-illumination and an indirect lighting.
Wait for the releasing of a completion photograph.
(Photo-3)